Case Study

Wye Valley Community Diagnostic Centre

The Diagnostic Centre is an impressive 1,140m², two-story building, expertly designed in collaboration with Medical Architecture and Architype for the Wye Valley NHS Trust

SECTOR

CLIENT

Wye Valley NHS Trust

LOCATION

Hereford

The building utilises Innovare’s Low Carbon Fire Safe 384mm i-FAST panel and Low Risk Rapid Build Full Structure solution. The Innovaré full structure solution consists of timber-based i-FAST wall panels with a hybrid low-carbon material approach for the floor and roof components.

Project Summary

CLIENT

Wye Valley NHS Trust

CONTRACTOR

Speller Metcalfe Limited

ARCHITECT

Medical Architecture & Architype

VALUE

£18m

GIFA

1,140m²

COMPLETION

September 2024