The Diagnostic Centre is an impressive 1,140m², two-story building, expertly designed in collaboration with Medical Architecture and Architype for the Wye Valley NHS Trust
The building utilises Innovare’s Low Carbon Fire Safe 384mm i-FAST panel and Low Risk Rapid Build Full Structure solution. The Innovaré full structure solution consists of timber-based i-FAST wall panels with a hybrid low-carbon material approach for the floor and roof components.